Onshore Control Building

The scope was to develop the performance specification for a new large unit modular operations control facility with a manufacture within a short conceptual window and contract award period.

Scope and definition was achieved, and the modular control building was delivered on time and within schedule for construction, commissioning and handover and integration to operations.

Key success of this project was the short lead times achieved for onsite delivery and handover to operations.