Normally Unmanned Offshore Platform Installation

Management of EPC for the Normally Unmanned (Platform) Installation in the Irish Sea.

Specific responsibility for the topsides and substructure (suction piles) design, total project safety management, certification, consents and approvals, commissioning procedures and handover procedures to the operator (HRL).

As a member of the Joint Venture Management team responsible for support during construction and platform and pipeline tie-in installation phases. Scope also included interface engineering and procedures for combined operations with jack-up drilling rig. Platform designed for 100MMSCFD with produced water disposal.