Decommissioning North West Hutton

The project was to manage the interface with offshore heavy lift contractor Heerema to decommissioning a 20,000-ton topside and 18,000-ton 8 leg jacket from the North Sea.

The project required the meticulous planning of the interface between offshore deconstruction and the onshore barge transportation and offloading to shore facilities.

The onshore scope included the full marine and vessel loading warranty surveying and planning required to manage and execute the load in of topside structures more than 2000 tons. The complete topside and jacket sections were transported and unloaded onshore for decommissioning without incident and achieved 97% recycling targets.