Pharmaceutical Chemical Containment Infrastructure

The project scope was to design and construct the site chemical capture culvert infrastructure containment systems.

The site was geotechnically challenging with the complete facilities on piled foundations, including road infrastructure.

The chemical and fire deluge capture containment channels encompassed the whole site facilities and required hydraulic design modelling over 2km to size the culvert, storage and separation facilities.

The project scope was managed as an EPC through detail design encompassing, hydraulic, monitoring and control systems. The project was construction managed, incorporating piled facilities and integration of the culvert capture system to all process areas.